The picture is a little more than half of the 60 meters we need to run a water pipe. Friends have two lots to the left under that large tree and I'm trying to get water there before construction starts in November. It seems that if you don't have a 2" mainline in front of your property you have to install that as well. A water contract with San Patricio is 1800 pesos but only includes 6 meters of 1/2" pipe. The 60 meter run is going to cost about 2500 pesos for material, 1200 for a backhoe and whatever a plumber charges to lay the 2" pipe.
The biggest problem is communication with the lot owners. The Canadians are very slow on email responses and Ron left San Miguel for Seattle about a week ago and I haven't heard from him. I assume Ron drove but maybe they flew and will rent a car. The two hangups so far are money and full sized (legal) copies of all the lot papers. So I wait to see what they can do for copies if they have them all and for some money deposited to my account.
0 comments:
Post a Comment