Showing posts with label canal. Show all posts
Showing posts with label canal. Show all posts

Thursday, September 11, 2014

Handling Crocs here s fairly common

This big boy was in the Jaluco Canal near houses and kids playing

Putting him in the La Manzanilla lagoon

Below is a capture close to the beach where tourists pass

Crocodylus acutus or Pancho the Croc is 3.83 meters and was in a body of water where there is a high traffic of people,Tourists were scared as they should be but they were still getting too close. It was re-located as a preventive measure. Armando Rubio and Biol. Luis Angel Tello along with enthusiastic people of Ejido La Manzanilla performed operation. La Manzanilla works in S.O.S. Program DGVS crocodile conservation, care, rehabilitation, rescue, environmental education and conflict prevention in the Crocodile Lagoon.

Monday, January 09, 2012

Behind Cihuatlan - up the river

We drove up the Marabasco river valley the other day as far as you can go to the larger dam site (Presa El Naranjo). Lots of work going on there but mostly cleanup and repairs from the rain from Jova. They gave the impression there were no tours like I'd had before so we just took the road to the right outside the gate that leads towards the river.

Down stream you can see the results of the massive amount of water that came down that valley. The access road was closed for over a week while they cleaned it up. The diversion dam area does not look the same at all .... all swimming holes gone and shade trees are down. Totally rebuilding the irrigation canals that feed from the diversion dam

Future dam opening with rocks from up river

Diversion dam

Behind the diversion dam

Rebuilding the irrigation canals

Video of Presa El Naranjo after Hurricane Jova



Some dam construction fotos from about 2 years ago

Saturday, October 15, 2011

I survived Jova

Not literally ... but early the morning after neighbors were waving to each other from their second floors just like you see in the flood disaster videos.

The wind woke me about 4am, I checked my car and there was only about 6 inches of water around it. I went to the unfinished upstairs to watch the storm for about an hour and a half and when I came downstairs I noticed water in the patio. I thought the pool had over flowed but then noticed the water was brown. Took another look at my car on the street and water was up on the hood ... too late to move it. Headed back to the bedroom and noticed water coming in from the garage. Since I had not prepared my pile of sandbags I had to sit and watch the house fill with a foot and a half of water and mud. I spent the rest of the night upstairs waiting for daylight. Closest thing to a flash flood I can imagine without a wall of water. Only took two hours for water to overflow the canal by 5-6 feet.

About 9am a few families started to walk out when the water had reached waist height and the bridge was passable. I waited till noon and headed for Vern and Elke's where I am to this day. My car got towed to a auto cleaning place yesterday and will head to a mechanic Monday. The neighbors are cleaning the house I was "sitting" and most of the houses in the area have cleaning crews in them.

So I'm actually quite lucky but many home owners NOT. My house in Pinal Villa was not affected except the access road is pretty bad. Lots of road closures in Jalisco and Colima. The Marabasco river overflowed and flooded Cihuatlan ... and actually cut a channel to the Barra lagoon which became a river mouth.
 
 
Cleanup efforts are massive here and emergency food is being brought in by the military. Spirits are surprisingly high and the sun is out

Families walk out as water receded

What the area looked like about 9am

Hurricane Jova experience in Melaque

Wednesday, January 26, 2011

Installing canales (drain spouts)

Installing 2 of 5 drain spouts. The other three will face the street off the front wall. They had to install them before the fine stucco in that area. The first "canal" I bought was $180 pesos (15 dollars) and when I went back to buy 4 more 3 weeks later the price went up to $250 pesos. That's why I don't like "El Pollo" ferreteria here in Melaque. I should have bought another style somewhere else.

Anyway, the second foto is Hugo measuring the length of the first one so they would be equal but he couldn't reach over the top of the wall. The third is Oscar filling in around the small tile wedge he installed to hold it in place.

They used me, standing on the ground, to see if it was straight and it turns out it's off a little to the right. Oh well, today we'll do the floor in the second bedroom.

Upper wall ready for fine stucco

Measure this

Filling in the wedge
The construction of the house finished in April 2011 and I'm pretty much settled in. As of March 2014 I'm in preparation for rain mode for this coming summer. That includes sealing and painting things and dealing with drainage issues from last year.

Sparks Mexico Web
Manzanillo Information
House building in Pinal Villa

Archivo del blog

Expat.com

Expat Exchange