We drove up the Marabasco river valley the other day as far as you can go to the larger dam site (Presa El Naranjo). Lots of work going on there but mostly cleanup and repairs from the rain from Jova. They gave the impression there were no tours like I'd had before so we just took the road to the right outside the gate that leads towards the river.
Down stream you can see the results of the massive amount of water that came down that valley. The access road was closed for over a week while they cleaned it up. The diversion dam area does not look the same at all .... all swimming holes gone and shade trees are down. Totally rebuilding the irrigation canals that feed from the diversion dam
Future dam opening with rocks from up river
Diversion dam
Behind the diversion dam
Rebuilding the irrigation canals
Video of Presa El Naranjo after Hurricane Jova
Some dam construction fotos from about 2 years ago