Monday, May 04, 2015

Necessary improvments

My front sidewalk was in need of some help. Not that it wasn't well built but we just didn't think of everything. Three downspouts dump water on it causing erosion, ants build caves under it, chickens excavate the edges looking for bugs .... and then there's the kids who like the sidewalk and the dirt in front of it. I told Hugo generally what I wanted and let him make the design decisions. I like what he came up with. A little more on the driveway to go.

Then there is my north wall.  Because someday (maybe never) there will be a house up against that wall I didn't worry too much about the stucco and it is pretty sloppy and very ruff. I also cut corners on properly sealing and painting it. Shoe had a couple 5 gallon buckets of cheap paint that was old so I mixed that with a little sealer and some decent paint but not semi-gloss. I'll only paint with semi-gloss from now on.  

So I figured I'd clean it up, primer a few areas and let Hugo go at it with a roller. Turns out I have wire brushed and/or cleaned with Clorox almost the whole wall. Also it's so ruff that doing a good job with a roller is almost impossible and you can't see your holidays 10-12 feet above you.  I will end up painting that whole 20x4 meter wall with a brush. Plenty of other painting for Hugo.

The second sidewalk

North wall mostly painted - sealed the bottom section today

20 meters by 4 high

Friday, February 25, 2011

Beach rocks

I quit early today after digging a foundation (only three bricks high) for the new 'sidewalk' (banqueta) that will surround the house. Have to aim the water away from the house and also just cover some of the dirt that I have lived with for the last three years. Cement, grass and garden will be much nicer than what I have. Placing rocks in the sidewalk somehow is the idea but we don't have a firm plan.

So I've been collecting rocks from all the digging we've been doing and have quite a pile but they aren't that pretty. My workers suggested going to the beach for rocks with lots to choose from ... and there are lots.

I sat there with my bucket and just enjoyed the afternoon, the ocean and the breeze

The construction of the house finished in April 2011 and I'm pretty much settled in. As of March 2014 I'm in preparation for rain mode for this coming summer. That includes sealing and painting things and dealing with drainage issues from last year.