Three house projects

I consider these finishing touches to a house that began very simple and not all that well planned. The largest is the awning (marquesina) along the house that will help keep rain away from doors and windows. Oscar is up there now filling the joints between the awning and the house that they had to cut out to attach it.

The second is a palapa over the ugly block of cement that covers the cistern in the middle of the yard. The four posts (castillos) are up and the palapa builder will be here next week to build the wood structure that sits on top. Gonna use the long palapas rather than the royal palm that is very much more expensive. He says with the right pitch and placed close together it should be good for 5 years. We'll see.

The third project is to replace a jury-rigged lamina roof that was over the outside wash and pump area. It will extend out 5 meters rather than the 1.5 meters of the old one. Will be much better protection for the area, equipment and can act as a partial garage. One column of the same type used above and two cement cross supports (vegas) that they just poured this morning.

Posts for palapa, house awning and lamina supports

New lamina supports for utility area

Soon to be covered with a palapa

Another view of the house awning

0 comments:

The construction of the house finished in April 2011 and I'm pretty much settled in. As of March 2014 I'm in preparation for rain mode for this coming summer. That includes sealing and painting things and dealing with drainage issues from last year.