Monday, November 15, 2010

The roof, the wash area and the stairs

Today they finished putting up the Panel-MG for the hand rail (pasa mano) and started a one meter wall around edge of the roof. The wash area still has it's roof supports so work there will wait a few more days. The main roof still has a week to go before the supports come down.

I'm anxious to see the work on the handrail as I've never seem them work with the Styrofoam panel. We decided to put four cut-outs for looks and a little more light in the evening.

Sad to say we are stuck with Mexican steps (short run almost equal to the rise). One fewer step with more foot space on each would be nicer. The maestro has some good ideas for the steps but that's finish work and will have to wait.

The roof

Panel-MG on the stairs

The stairs and a bit of the upstairs wall

2 comments:

marthabob2u said...

The casa is shaping up Scott! That styrofoam stuff is what I was watching them work with when I got inspired to make my cocodrilo in the back yard. It's neat.

sparks_mex said...

Hey Martha ... nice to hear from you. Didn't know you were a Blogger. I'll have to drop over some afternoon when things calm down a bit.

The construction of the house finished in April 2011 and I'm pretty much settled in. As of March 2014 I'm in preparation for rain mode for this coming summer. That includes sealing and painting things and dealing with drainage issues from last year.